Frontend Components for Logistics & TMS

Build Mobility and Logistics Apps Fast

Production-ready React components backed by swatmobility.com services

Shadcn-style reusable components for mobility and logistics platforms. Fully customizable, drop into any React app, and adapt to your design system. Perfect for people transport and logistics applications.

50+
Components
18
Data Tables
10+
Full Pages
100%
TypeScript

See It In Action

Production-ready components for every aspect of mobility and logistics management

Simulation detail page with vehicle routes

Complete Route Planning Interface — Zero Development Required

Drop in a full-featured route planning interface with interactive maps, vehicle management, and timeline views. Connected to backend by swatmobility developers — just install and use or customize.

Services page with table and filters

Services Management

Complete page for managing transportation services with filtering and scheduling

Drivers management page

Driver Management

Track driver availability, assignments, and performance metrics

Passengers page with bookings

Passenger Bookings

Manage passenger information, bookings, and transaction history

Timeline view with gantt chart

Timeline View

Gantt-style timeline for visualizing vehicle schedules and routes

Create notification interface

Notifications

Schedule SMS and push notifications for passengers and drivers

Track player with route playback

Route Playback

Replay historical routes with speed control and waypoint tracking

Everything You Need for Mobility & Logistics Apps

Frontend components backed by swatmobility.com infrastructure for mobility and delivery management

People Transport

Complete passenger transport solutions with booking management, ridesharing support, driver assignment, and real-time tracking for efficient people movement.

Logistics

18 pre-built table components, 10+ complete pages, and specialized editors for delivery management and supply chain operations. Install with shadcn CLI and customize.

Interactive Maps

Route visualization with Mapbox GL. Display vehicle routes, waypoints, and live tracking on interactive maps.

Backend-Powered

All components connect to production-grade logistics APIs. Fetch live data with automatic authentication and type safety.

Route Planning

Solve vehicle routing problems with automated planning algorithms or manual editing. Create optimal routes with autoplan, then fine-tune manually for real-world constraints.

Shadcn-Style Components

Fully customizable components that drop into any React app. Built with Radix UI primitives and Tailwind CSS. Copy, paste, and adapt to your design system.

Built for Real-World Logistics

Trusted by transportation companies for fleet operations, delivery management, and route optimization

Fleet Management

Track vehicles, assign drivers, monitor service schedules, and optimize fleet utilization across multiple projects.

Ride-Sharing & Carpooling

Manage passenger bookings, match riders, calculate routes, and handle JIT shift-based transportation services.

Last-Mile Delivery

Optimize delivery routes, track packages, manage nodes, and coordinate drivers for efficient last-mile logistics.

Route Optimization

Calculate optimal routes using swatmobility route optimization APIs, visualize waypoints, estimate travel times, and reduce operational costs.

Start Building Today

Install components via shadcn CLI and connect to your SGERP backend. Full TypeScript support included.